lookforjoe
True Classic
Another busy day, before the rains come in
got the valance lower edge welded & seam sealed, except for two section either side of center that will need a filler section
slapped some paint on the inside lower areas, just to cover up the primer. I'm going to work on more cleanup on the upper areas before painting.
Switched to a different brand of seam sealer on the inside of the valance, and it is anything BUT fast drying .
Then I worked on the right side C pillar skin - got it figured out & welded in place
weld tucked into recess - happy with that. Step in base of pillar should align nicely with modified stock belt molding.
slight issue on the bottom - once the upper was welded, the panel lifted somewhat, so now I have a gap to fill
Molding for 1/4 glass is definitely going to work as planned
got the valance lower edge welded & seam sealed, except for two section either side of center that will need a filler section
slapped some paint on the inside lower areas, just to cover up the primer. I'm going to work on more cleanup on the upper areas before painting.
Switched to a different brand of seam sealer on the inside of the valance, and it is anything BUT fast drying .
Then I worked on the right side C pillar skin - got it figured out & welded in place
weld tucked into recess - happy with that. Step in base of pillar should align nicely with modified stock belt molding.
slight issue on the bottom - once the upper was welded, the panel lifted somewhat, so now I have a gap to fill
Molding for 1/4 glass is definitely going to work as planned
Last edited: